On an average it takes one to two months to complete the whole process from your application to the commissioning of the rooftop solar system. However, the real time depends on the state where you live, the proactiveness of the electricity company (discoms) in the region in granting required permissRead more
On an average it takes one to two months to complete the whole process from your application to the commissioning of the rooftop solar system. However, the real time depends on the state where you live, the proactiveness of the electricity company (discoms) in the region in granting required permissions and the service quality of your solar vendor. In some states like Gujarat, where the whole system is faster, the connections are done within 20 days to one month. We need to keep in mind that in rooftop solar connections, while the solar installation will be done by the vendor, electricity companies handle the issue of installation of net-meters, its testing and final commissioning.
See less
Usually solar panels degrade at the rate of 0.5% to 0.8% oer year based on the technology used and the degradation rate. So after 20 years, if the degradation rate is 0.5%, the total effiiency of the solar panel will remain 90% instead of 100%.
Usually solar panels degrade at the rate of 0.5% to 0.8% oer year based on the technology used and the degradation rate. So after 20 years, if the degradation rate is 0.5%, the total effiiency of the solar panel will remain 90% instead of 100%.
See less