Structural engineering certificate Roof-specific load calculation and anchorage drawings Warranty details for the structure Audit reports, if available
Structural engineering certificate
Roof-specific load calculation and anchorage drawings
Warranty details for the structure
Audit reports, if available
See less


The State Cabinets of Andhra Pradesh and Odisha have approved Tata Power's plan to establish its 10 GW of integrated ingot-to-wafer plant. While in Andhra, the proposed site is Nellore, in Andhra Pradesh, it is Nellore. Both states are coastal states and close to some of the major and minor ports, wRead more
The State Cabinets of Andhra Pradesh and Odisha have approved Tata Power’s plan to establish its 10 GW of integrated ingot-to-wafer plant. While in Andhra, the proposed site is Nellore, in Andhra Pradesh, it is Nellore. Both states are coastal states and close to some of the major and minor ports, which can aid the firm in imports and exports. A final confirmation on the final destination is yet to be confirmed by the conglomerate.
See less