No. The Approved List of Models and Manufacturers (ALMM) for solar cells, issued by MNRE, does not fully reflect the entire Indian solar cell manufacturing landscape. The list covers only those facilities that have applied for inclusion and undergone MNRE inspections. As a result, newly operationalRead more
No. The Approved List of Models and Manufacturers (ALMM) for solar cells, issued by MNRE, does not fully reflect the entire Indian solar cell manufacturing landscape. The list covers only those facilities that have applied for inclusion and undergone MNRE inspections. As a result, newly operational factories or manufacturers that have not applied for verification may be missing. For instance, in the first ALMM list for solar cells, several notable manufacturers were absent due to such procedural gaps.
See less


Farmers, landowners, or developers interested in setting up solar power plants can participate. The project requires land within a 5 km radius of APDCL’s 33/11 kV substations. Participants need to submit an Expression of Interest (EOI) by May 8, 2025, as per the tender issued by APDCL. The scheme enRead more
Farmers, landowners, or developers interested in setting up solar power plants can participate. The project requires land within a 5 km radius of APDCL’s 33/11 kV substations. Participants need to submit an Expression of Interest (EOI) by May 8, 2025, as per the tender issued by APDCL. The scheme encourages local farmers to collaborate with solar developers to install decentralized solar plants.
See less